Currently Accepting Bids For

HVAC BID Amendment and Extension 

Marion C. Early R-V

HVAC Bid Amendment and Extension

All labor and material to provide and install the following:

1- Front Lobby: (2) 4 ton condensing units and evaporating coils installed on existing units. Complete with refrigerant lines, liquid, and suction driers, drain lines, duct connection, and flue pipe connections as needed. 208/1 phase, max fuse 45 electrical.

2- Locker Rooms (North Basement): (2) 3 ton ground mounted package units. Complete with ductwork, registers, return grille, propane kits, digital programmable thermostats. Exterior ductwork to be lined with 3# insulation and sealed. Units to sit on concrete pads. 80,000 Btuh input, 208/3 phase, max fuse 30.

3- Main Gymnasium: Removal of (4) existing unit heaters and (2) fans. Installation of (2) 20 ton ground-mounted package units. Complete with ductwork, registers, return grille, propane kits, digital programmable thermostats. Exterior ductwork to be lined with 3# insulation and sealed. Units to sit on concrete pads. Ductwork to enter building through existing penetrations. Any additional framing that is needed. 250,000 Btuh input, max fuse 125.

4- Coaches office and changing rooms (South Basement): (1) 5 ton ground mounted package unit. Complete with ductwork, registers, return grille, propane kits, digital programmable thermostats. Exterior ductwork to be lined with 3# insulation and sealed. Unit to sit on concrete pad. 120,000 Btuh input, max fuse 40.

5- All Purpose Room (Elementary): (2) 15 ton ground mounted package units. Exterior duct to be lined with 3# insulation and sealed. Units to sit on curbs on concrete pads. Complete with ductwork, registers, return grille, propane kits, digital programmable thermostats. 250,000Btuh, max fuse 90.

6- All electrical, plumbing components, and any other item needed for complete operational installation of items 1-5 will be provided by the contractor awarded the bid.

Bids shall be sealed and addressed to Dr. Josh Angel, Superintendent, no later than 5:00pm on February 18, 2020. It is the responsibility of the bidder to follow all legal mandates including, but not limited to, requiring: compliance with prevailing wage requirements, required safety training, documentation of participation in a federal work authorization program, and provide a performance bond. The district will review bids on February 20, 2020. The Board has the right to reject any and all bids Any questions shall be directed to Dr. Josh Angel at 417-376-2255 or jangel@mcestaff.com.